EPC Enquiries · IPP / PPA · Project Consultations

Let's Build Your
Renewable Energy Project

Whether you need an EPC contractor for your solar plant, want to explore open access power, or are evaluating captive or PPA options — our team is ready to engage.

Call Us +91 12345 67890
Office Hours Mon – Sat, 9:00 AM – 6:00 PM
Base Location Pan-India Operations

Send Us an Enquiry

Fill in your details and our team will get back to you within one business day.

Rooftop Solar EPC
Ground-Mounted EPC
Open Access
Captive / Group Captive
Long-Term PPA
O&M Services
Other

🔒 Your information is kept confidential and used solely for project consultation purposes.

Registered Office

Stake Energy Pvt. Ltd. India (Pan-India Operations)
Registered: India
General Enquiries +91 12345 67890
Business Hours Monday – Saturday: 9:00 AM – 6:00 PM IST

Typical Response Time: Under 24 Hours
Our project team responds to all EPC, open access, captive, and PPA enquiries within one business day.

Specialist Teams

EPC Projects epc@stakeenergy.in
Open Access & IPP / PPA openaccess@stakeenergy.in
O&M Services om@stakeenergy.in
MNRE Empanelled EPC Contractor
CEA & CERC Compliant Projects
Open Access Across 15+ States
500+ MW Delivered & Under Development
Dedicated C&I Project Teams

Project Offices Across India

Stake Energy operates pan-India with regional project teams embedded in key renewable energy corridors.

Western India

Regional Hub — Rajasthan & Gujarat
Rajasthan / Gujarat

Southern India

Regional Hub — Karnataka, Tamil Nadu & AP
Karnataka / Tamil Nadu / Andhra Pradesh

Central & Northern India

Regional Hub — Maharashtra, MP & UP
Maharashtra / Madhya Pradesh / Uttar Pradesh

Common Questions

Quick answers before you reach out.

What types of projects does Stake Energy handle?
We handle ground-mounted solar EPC (from 1 MW to 100+ MW), industrial and commercial rooftop solar, solar structure design and engineering, and we also develop our own IPP projects — open access, captive power plants, group captive, and long-term PPAs for C&I clients.
Which states do you operate in?
We operate pan-India with active project presence in Rajasthan, Gujarat, Maharashtra, Karnataka, Tamil Nadu, Andhra Pradesh, Telangana, Madhya Pradesh, Uttar Pradesh, Haryana, and Odisha. Our open access projects span states with favourable SERC/DISCOM frameworks.
What is the minimum load for open access eligibility?
Under CERC regulations and most state SERCs, consumers with a contracted demand of 1 MW or above are eligible for open access. Some states have reduced this threshold. We assess eligibility based on your specific state, load profile, and DISCOM category — reach out for a free assessment.
How does a PPA arrangement work with Stake Energy?
Under our PPA model, Stake Energy develops, owns, and operates the solar or wind plant. You simply purchase the power at a fixed or indexed tariff — typically 15–35% below your current grid tariff — for a term of 15–25 years. Zero CAPEX is required from your side, and we handle all compliance, regulatory filings, and O&M.
How long does it take to commission a ground-mounted plant?
A typical 5–20 MW ground-mounted EPC project takes 6–10 months from feasibility to commissioning, depending on land clearance, grid connectivity approval, and state-specific DISCOM timelines. We manage the entire regulatory and construction schedule on your behalf.
What savings can I expect from switching to solar or open access?
Most C&I clients see energy cost reductions of 20–45% depending on project structure. Rooftop solar with net metering typically saves 20–30%. Open access and captive arrangements typically deliver 30–45% savings, factoring in open access charges, wheeling, and cross-subsidy surcharge where applicable.